The home page for Penobscot Bay Press Community Information Services
News and information for unique towns and islands of East Penobscot and Blue Hill Bays, Maine.
Community Calendar: A searchable, comprehensive calendar of area events
Compass Classifieds: Classified ads from throughout the area
Castine Patriot: News and information for Castine and Penobscot, Maine
Island Ad-Vantages: News and information for Deer Isle, Isle au Haut and Stonington, Maine
The Weekly Packet: News and information for Blue Hill, Brooklin, Brooksville, Sedgwick and Surry, Maine
Community Information: Remembrances, Business Directory, Town Information, Tides and Weather
Archives & Multimedia: Short-term archives, videos, slideshows and special features
Contact Us: Who we are and how to reach us
The Weekly Packet
Local news and information from
Blue Hill, Brooklin, Brooksville, Sedgwick, and Surry, Maine.

Find where to go and what to do in our Seasonal Guide Visitor's Portal.

Check out our newly rebuilt online store
to purchase subscriptions, books, movies and maps.

spacer

News Feature

Brooksville
Originally published in The Weekly Packet, November 10, 2011
Brooksville voters approve wind turbine ordinance

by Faith DeAmbrose


By more than a two-to-one margin, Brooksville voters approved a Wind Energy Systems Ordinance on November 8 as part of the town’s general election process.

The ordinance, which handily passed with 274 votes for and 111 votes against, puts into place a number of town-specific regulations governing the construction, height and decibel level of wind turbines and funds for having them removed.

As previously reported in The Weekly Packet, the maximum tower height would be 100 feet. Since the length of a rotor blade is typically one-half the tower height, the total height would be about 150 feet to the tip of the blade at the top of its arc. (This contrasts with the approximate 400-foot blade tip height for the wind turbines on Vinalhaven.)

The maximum allowable power output of a turbine would be 50 kilowatts. The maximum sound level at a property boundary would be 35 decibels.

The ordinance requires that a surety bond be posted for facilities between 10 and 50 kW to cover the cost of removal if a tower is abandoned.

The Wind Energy System Ordinance is available for viewing in its entirety at the town’s Web site, brooksvillemaine.org.


Share this page


             

Return to the Weekly Packet home page

Return to the Community News home page


Penobscot Bay Press


Return to top

Contact Us Penobscot Bay Press Community Information Services
207-367-2200 P.O. Box 36, Stonington, ME 04683 info@pbp.me
spacer